SEIF AL NASR l Water Technology

Instructions to Install U.P.V.C. Pipes with Gaskets

– Insert the tail of the pipe in the pipe’s head without a rubber ring, then draw a circle to indicate the area of the nesting between the head and the tail.– The rubber ring is then well-cleaned and the internal surface of the pipe’s head (figure 1). To easily install the rubber ring in […]

– Insert the tail of the pipe in the pipe’s head without a rubber ring, then draw a circle to indicate the area of the nesting between the head and the tail.
– The rubber ring is then well-cleaned and the internal surface of the pipe’s head (figure 1). To easily install the rubber ring in the pipe head’s cavity, follow the steps in (figure 2).
– The tail of the pipe is then cleaned with the cleaning liquid to remove any grease or stuck residue. (figure 3)
– The chiseled part is then cleaned with liquid soap or with vegetarian grease; afterward, apply a little of the same liquid substance used on the external surface of the rubber ring only in a circular movement to ease the installation process.
– The head and the tail are then placed on the same level and then pushed in one movement to complete the installation.
– Use A butterfly valve for pipes wider than 280mm to insert the pipe’s tail in its head.

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare

SEIF AL NASR - Water Technology
Leading Pipes Manufacturers

Contacts

10th of Ramadan Factory
South A6, Plot 13, Egypt

sales@seifalnasr.com

Main Offices

Saturday-Thursday: 8am-5pm

Friday: Holiday